Infrastructure Construction, of King Faisal University , undertaken to construct by Faisal Electro-Mechanical Co. Ltd. And Yüksel İnşaat Saudia Co. Ltd. in 2002, has been realized as of Phase 1,2,3,4 and 6 within the scope of different contracts. Project is being established on an area of 2.000.000 m 2 and approximately 400.000 m 2 of it was produced by filling the sea, in Dammam city of Saudi Arabia.

Within the miscellaneous phases mentioned above, 3.000.000m 2 sand filling, control room of 3.000m², underground water tank having the capacity of 1.800m³, road construction of 300.000m², sea protection of 930 m (Rip-Rap), cooling towers and cooling units of 13 pieces having the capacity of 1.300tons, water treatment plant having the capacity of 1.200m³/day, waste water treatment plant having the capacity of 2.100m³/day, waste water pumping station having the capacity of 85lt/sec, rain water pumping station having the capacity of 250lt/sec, LPG system, piping network, communication systems, electrical and control systems and electric works of the buildings were performed.



 

    About Yüksel

 
   
 
 
 
   King Faisal University Permanent Campus Project -
   Phase 1, 2, 3, 4 & 6 / Damman, S. Arabia
 
 Client   Saudi  Arabia
  Ministry of Higher Education
 Location   Saudi Arabia
 Contract Date   09.10.2002
 Completion Date   31.12.2007