King Faisal University Permanent Campus Project - Hospital Area - Phase 2 Infrastructure Works contract scope consists of excavation and filling, storm water system, underground piping and valves, manhole and catch basin work, sidewalks, drinking, RAW & fire water networks, fire fighting system, sanitary sewer system, irrigation system, CCTV, CCM & BMS system, telecommunication system, earth work, concreting, architectural work, thermal & moisture protection, conveying systems, pumps, cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network and drainage system network.