Bandırma Port Project included construction of a pier
of 3,385 m. long (4 -12 m.), 1,500 m. of breakwater and a concrete piled fuel
pier of 3,500 m². In the construction of port; • 2,064,700 tons of rock
• 162,630 m³ of concrete • 1,150,200 m³ dredging • 1,195,800
m³ backfill works were materialized.