The purpose of this project is to transmit desalinated
water from Yanbu industrial area to Yanbu city, Rayyis and Madinah with a
capacity of 363,000 m³/day. Project consists of three different groups
of work; pipeline, stations & reservoirs and housing compound.
For the
pipeline portion of the project Yüksel performed all kinds of civil
works such as trenching, sand filling, backfilling valley protection, protection
of existing 32” line, construction of drain, vent, tap off, line valve
stations and construction of maintenance road along 60” and 32”
steel pipelines having a total length of 200 km.
For the stations and reservoirs
Yüksel carried out the construction of 4x 140.000 m³ steel reservoir
foundation at Yanbu site, 12 x 50,000 m³ concrete reservoirs at Madinah
and Musayjeed sites, 2 x 25,000 m³ R.C. reservoirs at Hamrah site, 1 x
25,000 m³ concrete reservoir at Badr site and 1 x 1,000 m³ concrete reservoir
at Furaish site together with related station buildings and site works
such as storm water drainage, roads, walkways, fences and gates.
For the housing
compound project, Yüksel executed the construction of 18 luxurious three
floor building at Yanbu, 1 bachelor house at Musayjeed, 2 guest villas and
1 bachelor house in Medinah for SWCC employers with a total coverage area
of 41,.000 sqm including all kinds of civil, architectural and electromechanical
works.