Karkamış Dam and HEPP is the second unit of the lower Projects that comprises a part of the South-eastern Anatolia Project, and it’s the first application implemented in Turkey as a river plant which is clay cored fill type at 4.5 km. distance to the Syrian Border on the Euphrates River. The plant has an installed capacity of 189 MW and aims to produce 652.5 GWh of power annually. Left and right bank protection dykes of the reservoir have also been designed to protect public settlements and 433 hectare agricultural lands by which reservoir elevation is raised up from 336 m. to 340 m. Karkamis Dam and HEPP, which was constructed by Yüksel Construction and international consortium partners (hydro-mechanical works and civil construction by Yüksel and Temelsu; electro-mechanical works by the Austrian consortium members Va Tech Elin, Voith Hydro, Verbundplan), has a crest elevation of 344 m., crest length of 1,647 m. and total fill volume of 2,100,000 m³. Its six bulb type turbines have a capacity of 32 MW each.
 

    About Yüksel

 
   
 
 
   Karkamış Dam and HEPP / Gaziantep
 
 Client   General Directorate of   State   Hydraulic Works
 Location   Gaziantep / Turkey
 Contract Date   07. 12. 1995
 Completion Date   In Progress