Yüksel Construction Co., Inc. as a member of the Va Tech
Wabag (Austria), Serco Group (United King-dom) and Ener Construction Co.,
(Turkey) Consortium, carried out the construction of all functional and
nonfunctional structures together with their infrastructure, supply and
installation of entire electrical systems and site piping works and at the
same time executed installation of mechanical equipments and automation
systems. Yüksel Construction Co., Inc. also takes part in the commissioning
and operation of the unit. Two separate plants, namely East and West Adana,
were designed to serve the needs of entire Adana for the target year of
2025. Inlet, primary sedimentation, sludge treatment units, overflow and
by-pass systems for the target year of 2025, wastewater treatment units
for the target year of 2010 and 2015 was constructed within the scope of
the plants of the target years of 2010, 2015 and 2025. The treatment type
applied in the plant is biological treatment defined as conventional activated
sludge method. For raw sludge and excess activated sludge treatment, anaerobic
sludge digestion method was applied. The plant, having the treatment output
which conforms with discharge criterias imposed by the European Union specifications,
was designed to be able to accommodate the expansion of nitrogen and phosphorus
treatment in the future stages. Around 50% of energy requirement of the
plants, is recovered from biogas resulting from sludge digestion process.
Main design criterias of the plants are as follows:
| |
Target Year |
Dry Weather Discharge |
Equivalent Population |
| West Adana
|
2010
2025
|
230.000 m³/gün
312.000 m³/gün
|
1.151.000
1.761.000 |
| East Adana |
2015
2025 |
171.000 m³/gün
204.000 m³/gün |
710.000
924.000 |