The construction of Ankaray Light Rail Mass Transit System which is a viable contemporary solution to the transportation problem of the expanding capital, Ankara, was carried out by Yüksel Construction and Bayındır Construction J.V. who realized the civil works as a double track of 8.7 km. of railway between Dikimevi and Sögütözü. Electro- mechanical works were implemented by Siemens, Breda, AEG and Simko firms. The project included 2,058 m. of bored tunnel, 5,922 m. of cut and covered tunnel, 355 m. at grade and 11 stations. During these construction works 9,915 piling, 152,500 m³ of concreting, 16,700 tons of reinforcement work was completed. In this project 42,457 m. of track was laid, 1,257,000 m³ of excavation and 386,000 m³ of filling was realized. The daily passenger capacity is 350,000 for Ankaray and 11 trains are operational for 18 hours a day. These trains reach the final point within 17 minutes after departure. Yüksel is proud to have completed this project which is the first ever application of its kind in Ankara.
 

    About Yüksel

 
   
 
 
 
   “Ankaray” Light Rail Mass Transit System / Ankara
 
 Client

  Ankara Metropalitan 
  Municipality

 Location   Ankara / Türkiye
 Contract Date   27. 09. 1991
 Completion Date   26. 07. 1996