The construction includes a total of 1,300 m. of highway bridges, pedestrian connection corridors (connecting the car park and the terminal building), main and secondary car parks, the heating gallery harboring electrical and plumbing systems and the drainage systems, a waste water treatment plant and the sewage system. Within this project; viaducts, tube overpass, perimeter security fence and wire mess, escalators, asphalting works were also constructed and implemented with success.